Table of Contents
It’s almost time—your window installation is coming up! If you’ve never had new windows installed, you may be wondering what to expect and what you can do to make the process go as smoothly as possible. Don’t worry, we’ve got you covered.
In this blog, we’ll walk through each step of the installation timeline, talk about how to prep your house for your new windows, and share a few helpful tips to keep in mind before the installers head out. Let’s get started!
How to Get Your Home Ready for New Windows
Before Your Contractor Arrives
- Plan for your small children and pets. For their safety, make arrangements for their care the day (or days) of your window installation.
- Move furniture away from your windows so the contractor has a clear path to the areas around your current windows.
- Remove any fragile items from the area to ensure the safety of your possessions.
- Remove your window treatments including curtains, blinds, and curtain rods.
- Outside, make sure contractors can access your windows without difficulty. Trim bushes and shrubs so the crew can reach your windows with ease.
How You Can Prepare for Your Window Installation Day
Check the Weather
As your window installation draws near on the calendar, check the weather forecast. If the elements aren’t cooperating, reach out to your contractor about rescheduling. Rainy or extremely cold weather will probably cause delays. Extended periods of inclement weather will likely postpone the jobs installers are finishing before they can start on your project. Communication prior to your installation date is key so you know exactly when to expect the crew.
Schedule the Day Out of the Office
Next, make sure you can be present during the installation in case the crew has any questions for you, and so you can get your questions answered.
Understand Which Type of Window Replacement You’re Getting
There are two types of replacement windows: insert replacements and full frame replacements.
- Insert replacement – These are also called “pocket replacements.” This method of window replacement involves removing your old window’s sash and tracks but leaving your existing window frame and windowsill in place. A new window unit, complete with its own frame, is then inserted into the opening. This is less disruptive and more affordable than a full-frame replacement.
- Full-frame replacement – In contrast to an insert, a full-frame replacement involves removing the entire window including the frame, down to the rough opening, and then installing a new window with a new frame. This allows for more flexibility in addressing potential issues with your current frame, such as rot or damage.
The Window Installation Process: What to Expect
1. You’ll Meet Your Project Manager
The morning of your window installation, you’ll meet the project manager and do a walkthrough of your house before any work begins. This is a good time to ask any questions you have.
2. The Area Will Be Prepared for Window Installation
Drop cloths should be laid near walls to ensure your home is well shielded from dirt and debris before your windows are removed.
3. Your Current Windows Will Be Removed
For full-frame replacements, once your window, frame and trim have been removed, your installation team will inspect the opening for any damage from moisture intrusion. If wood rot is discovered, it will need to be repaired before your new windows are installed. In contrast, insert replacements won’t get down to the rough opening and won’t need the same preparation.
4. Beautiful Replacement Windows Will Be Installed
Next, the moment you’ve been waiting for…your new windows will be installed! With Replacement Windows by Lakeside, when your windows are being installed, you won’t get a 3rd party crew—instead, we use our own in-house crew. We are founded on the principle that if we invest and care for our team, they will invest and care for our customers.
Your installation crew will make sure your windows are a perfect fit for your opening and that your windows work effortlessly. The edges will be sealed to keep water and outdoor air from making its way into your house. Once it is sealed, the opening will be insulated to ensure you get optimal energy efficiency.
5. Exterior Trim Is Added
If you included it in your replacement window plan, exterior trim will be replaced at this time, ensuring a tight seal against weather. And voila! Your gorgeous new windows are ready to enjoy!
6. Your Contractor Will Clean Up the Area
Your old windows and any debris from the installation will be hauled away. The work area will be cleaned up thoroughly, ensuring nothing is left behind in your home. Drop cloths will be removed, and everything should look as good as it did before your contractor arrived.
7. A Final Walkthrough Will Be Conducted
The last step of the installation process is a final walkthrough with your project manager. A final inspection will be made to verify all the windows fit seamlessly and are functioning perfectly. You’ll learn how to clean them, how they work, and can ask any questions you have at this time.
Once your complete satisfaction is confirmed, the window installation process is done! All that’s left to do is enjoy your window makeover.
Upgrade Your Home’s Comfort, Energy Efficiency, and Security with New Windows
Now that you understand the window installation process and how to get ready for it—to further help you throughout the journey—check out The Ultimate Guide to Replacement Windows: Choosing the Best For Your Home.
At Replacement Windows by Lakeside, our expert team carries out your window installation with attention to detail, ensuring a seamless process while keeping you updated every step of the way.


